Ship Building Storage Tanks & Boilers Pressure Pipes Railway Coaches
1G 2F 3G 4G
I.R.S, L.R.S, I.B.R, B.V, D.N.V, P.D.I.L, B.I.S [ISI], TOYO[TEIL], THERMAX,L & T A.B.S, K.N.P.C., K.P.G. I.L,I.O.C.L,M.R.P.L, TPL
UHDE INDIA LTD., M.M.D., B.H.P.V., N P C I L, RDSO CLASS A2,
1) In case of varticle download welding,manipulate the electrode,keeping its tip in contanct with
2) Dry the electrode at 70-100 °C for 30-60 min.before use.
C% | Mn% | Si% | S% | P% |
---|---|---|---|---|
0.12 Max | 0.65 Max | 0.40Max | 0.040 Max | 0.040 Max |
U.T.S.(N/mm²) | Y.S.(N/mm²) | ELONGATION ( L = 5d ) % | IMPACT ( CVN ) AT 0° C | RADIOGRPHY TEST |
---|---|---|---|---|
460 – 560 | 370 – 480 | 22 % Min | 47 Joules Min | Satisfactory as per IIW blue std |
SIZE ( mm ) | KG PER PACKET | KG PER CARTON | Current (Amps) | In Amps | ||
---|---|---|---|---|---|---|
2.50 x 350 | 5 | 20 | 11 | 44 | 60-90 | AC/DC (-) |
3.15 x 350/450 | 5 | 20 | 11 | 44 | 100-140 | |
4.00 x 350/450 | 5 | 20 | 11 | 44 | 140-190 | |
5.00 x 350/450 | 5 | 20 | 11 | 44 | 190-250 |
WhatsApp us